期刊文献+

三峡工程运行初期上游引航道通航水流条件研究 被引量:2

Navigation Conditions in Upstream Approach Channel of TGP in Initial Operation Period
下载PDF
导出
摘要 三峡工程运行初期,上游引航道通航水流条件受水库调度等因素的影响变得更加复杂。针对隔流堤漫顶后上游引航道内通航水流条件的变化,通过水工模型及自航船模对上游的航道通航水流条件进行了试验研究。试验成果表明:在通航条件下,在引航道内与口门区的水力学参数均能满足设计要求,船模船队航行上下行均较顺畅。 In the early period in operation of TGP, the navigation conditions in upstream approach channel of TGP lock will become more complicated becease of the resorvoir impoundment. When the reservoir water level is higher than the top of dividing dike, the navigation conditions change. According to this change, the navigation conditions in upstream approach channel have been studied by the hydraulic model test and remote-controlled ship model test. The study results show that in the navigation period the hydraulic parameters can meet the requirements of design in the entrance region and the approach channel, and the barge-tow model can navigate smoothly.
出处 《长江科学院院报》 CSCD 北大核心 2007年第3期64-67,共4页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程 通航水流条件 上游引航道 Three Gorges Project(TGP) navigation condition upstream approach channel of lock
  • 相关文献

参考文献3

  • 1杨伟,蔡莹,左明,等.三峡枢纽正常运行期隔流堤漫顶情况上游引航道通航水流条件试验综合报告[R].武汉:长江科学院,2005.
  • 2史德亮,杨伟.三峡工程升船机上航道通航设施布置水工模型试验研究报告[R].武汉:长江科学院,2001.
  • 3史德亮,杨伟.三峡工程升船机上闸首右侧浮堤长度优选水工模型试验报告[R].武汉:长江科学院,2000.

同被引文献17

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部