水布垭枢纽左岸钢筋混凝土防淘墙采用了通过竖井垂直向下泵送混凝土的施工工艺,对其在左岸防淘墙L3-L5段施工中存在的主要问题及解决对策作了介绍。
The concrete is pumped downwards through vertical shaft to the construction site of anti-scour wall on the leftbank of Shuibuya Hydropower Project,the construction technology of pumpcrete and the countermeasures to resolve the difficuties in construction of L3-L5 section of the anti-scour wall are described.
出处
《湖北水力发电》
2007年第3期23-25,47,共4页
Hubei Water Power
关键词
防淘墙
泵送混凝土
应用
anti-scour wall
pumpcrete
application