期刊文献+

飞云江特大桥预拱度计算及施工内力分析 被引量:4

Calculation of the Predetermined Camber and Analysis of Internal Stress in Feiyunjiang Bridge Construction
下载PDF
导出
摘要 文章通过采用有限元方法,对飞云江特大桥主桥九跨预应力混凝土连续箱梁桥的悬臂浇筑施工进行了数值模拟分析,阐述了预拱度具体的计算方法,提出了计算挂篮弹性变形的简单实用的公式;同时,对施工过程中最大单T结构状态及Π结构状态的内力进行了对比分析,对于更好地进行桥梁施工具有很好的指导意义。 With FEM, numerical simulation analysis of cantilever casting of the continuous prestressed concrete box beam for Feiyunjiang Bridge (with nine spans) is made; calculating method for the predetermined camber is presented and the simple and practical formula for the calculation of distortion of form traveler is brought out; and the contrast analysis of the internal stresses in the maximum T-shape and Ⅱ-shape is made respectively; the measures adopted above will have guidance value for the practical bridge construction.
作者 王鹤
出处 《安徽建筑》 2007年第3期131-132,134,共3页 Anhui Architecture
关键词 有限元法 施工预拱度 挂篮变形 内力对比分析 FEM predetermined camber distortion of form traveler contrast analysis of internal stress
  • 相关文献

参考文献4

二级参考文献6

共引文献49

同被引文献10

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部