期刊文献+

离散制造企业车间在制品的跟踪管理 被引量:9

Track Management of Work-in-process in the Workshop of a Discrete Manufacturing Enterprise
下载PDF
导出
摘要 提出离散制造企业车间在制品跟踪管理方法;对在制品进行类别的详细划分和状态定义;确定在复杂的工艺规程、多变的加工状态及并行的组合件装配环境下的车间在制品跟踪管理所需的信息及集成方式;建立车间在制品跟踪管理与制造执行系统的规范化的接口机制;实现了车间在制品跟踪管理在制品核心处理流程与数据库设计;并结合实际应用验证了其合理性与实用性。 We present a method for track-managing the work-in-process (WIP) in the workshop of a manufacturing enterprise. The WIP is sorted out and its status is defined. Facing complex process plans, changeable processing statuses and parallel assembling conditions, we determine the information required for the track management of WIP and its integration method. Furthermore, we establish a standard interface mechanism between WIP track management and manufacturing execution system (MES), thus achieving the core processing flow and database design of WIP track management. Its application to an enterprise verifies its reasonableness and practicality.
出处 《机械科学与技术》 CSCD 北大核心 2007年第6期797-802,807,共7页 Mechanical Science and Technology for Aerospace Engineering
基金 国家863计划项目(2001AA412150 2003AA411110) 教育部博士点基金项目(2004699025)资助
关键词 在制品跟踪管理 离散制造企业 制造执行系统 work-in-process track management discrete manufacturing enterprise manufacturing execution system
  • 相关文献

参考文献8

  • 1王军强,孙树栋,司书宾,褚崴,于晓义.组件化和集成化车间生产管理系统的研究与实现[J].计算机集成制造系统,2006,12(2):231-239. 被引量:27
  • 2李翌辉,马雪芬,董朝阳,孙树栋.构建面向航空制造企业的车间管理信息系统[J].计算机工程与应用,2003,39(18):15-18. 被引量:13
  • 3Kun L J.Work in Process (WIP) Analysis of The Flexible Manufacturing System Using Time Petri Nets Unfolding[ R ].IEEE Paper 0-7803-4778-1/98,1998:136~141
  • 4Ahmadi J.A Rule Based Flow Control Plan for Management of Work-in-Process[R].IEEE Paper CH2864-7/90/0000-0270,1990:270~276
  • 5Jang H L.Artificial intelligence-bases sampling planning system for dynamic manufacturing process[ J ].Expert Systems with Applications,2002,22(2):117~133
  • 6John M U,Kiran J F.Dynamic process planning-the static phase[J].Journal of Materials Processing Technology,1996,61(1,2):53~58
  • 7Seethaler R J,Yellowley I.Process control and dynamic process planning[J].International Journal of Machine Tools and Manufacture,2000,40 (2):239~257
  • 8Voorhees E M.A Work-In-Process Tracking System for Experimental Manufacturing[ R ].IEEE Paper CH2806-8/89/0000/0190,1989:190~197

二级参考文献16

共引文献38

同被引文献57

引证文献9

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部