摘要
通过给水泵RB逻辑在发电厂实际运行中的完善过程分析,揭示DCS初始设计不符合生产实际工况时,进行优化修改的必要性与可行性。
An analysis was made on the application and improvement of feedwater pump RB logic in a power plant, and it shows that the initial design of DCS is not conforming to production reality, an optimal modification is necessary and possible.
出处
《华北电力技术》
CAS
2007年第6期38-40,44,共4页
North China Electric Power