摘要
对神头二电厂机组协调控制系统的特点及存在问题进行了详尽的阐述,对其控制策略进行了优化设计与分析,并经过工程实践检验证明优化方案效果良好。
The characteristics of coordinate control system of Shentou No. 2 Power Plant and its existing problems are presented in detail. Its control strategy was optimized in design and analysis was made on the optimal design. The field practice shows the optimized scheme achieves good result.
出处
《华北电力技术》
CAS
2007年第6期49-51,54,共4页
North China Electric Power
关键词
协调
负荷指令
燃料量
控制方式
coordinate
load instruction
fuel quantity
control mode