期刊文献+

既有双线提高旅客列车速度对起停附加时分及追踪列车间隔的影响 被引量:2

The Influences on Additional Starting/Stopping Time and Tracking Train Headways by Raising Running Speed ofPassenger Trains on Existing Double Railway Lines
全文增补中
导出
摘要 将旅客列车速度提高到140~160km/h是铁路改善旅客运输质量、参与市场竞争的重要手段,是铁路面临的新课题。本文对既有双线自动闭塞区段提高旅客列车速度并相应提高货物列车速度后旅客列车起停附加时分及货物列车起停附加时分的变化进行了分析和讨论,进而对旅客列车提高速度后的列车追踪间隔时间I追、列车到达间隔时间I到、列车出发间隔时间I发和列车不停车通过车站间隔时间I通的变化情况进行了较为详细的分析。 To improve the service quality of railway passenger transportation and to meet the needs of market competition, the measure of raising running speed of passenger trains on existing double railway lines must be taken. In this paper,the changes of additional starting/stopping time on passenger trains and freight trains are discussed when the running speed of passenger trains is raised and the running speed of freight trains is also raised correspondently on existing double railway lines. The changes of the tracking train headways, the arriving tracking train headways, the starting tracking train headways and the station passing tracking train headways are also discussed.Finally, some useful conclusions are reached.
作者 严余松
出处 《西南交通大学学报》 EI CSCD 北大核心 1997年第1期64-69,共6页 Journal of Southwest Jiaotong University
关键词 旅客列车 提速 起停附加时分 追踪列车间隔 existing double railway lines speed raising for passenger trains additional starting/stopping time of trains tracking train headways
  • 相关文献

参考文献4

  • 1管天保,中国铁路,1996年,3期
  • 2华茂--,中国铁路,1996年,2期
  • 3郑时德,铁路行车组织,1988年
  • 4杜文,铁践重载运输论文集,1987年

同被引文献10

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部