期刊文献+

一类P/S_(ij)/C_(max)问题的LS算法分析 被引量:2

AN ANALYSIS OF LS PROCEDURE FOR P/S ij /C max PROBLEM
下载PDF
导出
摘要 提出一类有准备时间的排序问题;分析了LS算法解此问题的最坏情况;修改了LPT算法,使最差性能指标由4-2m改进到83-23m. One kind of scheduling problem with setup time is proposed, the worst_case performance of LS is studied, LPT algorithm is improved and the worst_case performance ratio 4-2 m is reduced to 83-23 m .
出处 《曲阜师范大学学报(自然科学版)》 CAS 1997年第1期9-12,共4页 Journal of Qufu Normal University(Natural Science)
基金 国家自然科学基金
关键词 最大完工时间 LS算法 LPT算法 排序 makespan setup time LS algorithm LPT algorithm
  • 相关文献

同被引文献7

  • 1Liu J W S,Liu C L.Bound onscheduling algorithms for heterogeneous computing systems[J].Proc IFIP,1974.349~353.
  • 2Yookun Cho,Sartaj Sahni.Bounds for LIST schedules on uniform processors[J].SIAM JComputers,1998,91~103.
  • 3Chen Bo,Arjen P A Vestjens.Scheduling on identical machines:How good is LPT in anon-line setting[J].Operations Research Letters,1997,21(4).
  • 4Hong K S,Leung J Y T.On-line scheduling of real-time tasks[J].IEEE Transactions orComputers,1992,41:1326~1331.
  • 5Vestjens A P A.Scheduling uniform machines on-line requires nondecreasing speedratios[A].Memorandum COSOR 94-95 Eindhoven University of Technology.
  • 6秦成林,潘家定.具有两台专用机、两台通用机的Q_4//C_(max)问题的近似算法[J].运筹学学报,1998,2(1):64-70. 被引量:10
  • 7张玉忠,杜东雷,林钧昌.关于P|s_(ij)|C_(max)问题的LPT算法[J].应用数学学报,1999,22(1):154-157. 被引量:10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部