广州地铁石灰岩地层中的盾构施工技术 被引量:1

On the Shield Construction Technology for the Guangzhou Subway in Lime Rock Stratum
下载PDF
导出
摘要 介绍了广州地铁石灰岩地层地质特征,提出盾构在此地层中施工要进行岩溶、土洞预处理,对掘进中出现的喷涌、盾构偏移、管片上浮等问题进行了原因分析并提出控制措施,对同类工程有参考价值。 The geological characteristics of the lime rock stratum of the Guangzhou Subway is introduced in the paper, which points out that when a shield is used for construction in lime rock stratum, karst and earth holes have to be pre-treated. The causes of gush, the shifting of the shield and the up-moving of the gilled tubes occurring during the drilling operation are analyzed, with control measures put forward. It may serve as a useful reference for other similar projects.
作者 宫海光
出处 《国防交通工程与技术》 2007年第2期49-51,55,共4页 Traffic Engineering and Technology for National Defence
关键词 盾构机 石灰岩地层 岩溶 土洞预处理 螺旋输送器喷涌 盾构机卡壳 shield lime rock stratum pre-treatment of karst and earth holes gush at the screw conveyer jamming of the shield
  • 相关文献

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部