北仑电厂码头大管桩裂缝调查检测及修复加固方案设计 被引量:4

Check and Inspection of Cracks on Large Concrete Pipe Piles of Beilun Power Plant's Pier and Design of Rehabilitation Schemes
下载PDF
导出
摘要 通过对北仑电厂码头大管桩的详细调查与检测,发现混凝土大管桩多处存在纵向裂缝和周向裂缝,直接影响码头混凝土结构的安全性、耐久性。在分析研究的基础上,对存在裂缝的大管桩提出合理的修复方案,为码头的安全运行提供保障。 Through check and inspection to the large pipe piles of Zhejiang Beilun Power Plant' s pier, a lot of cracks were found in portrait and circle on the surface of prestressed concrete pipe piles which affect security and durability of the concrete structures directly. On the basis of analysis, reasonable rehabilitation schemes were designed to guarantee safe operation of piers.
出处 《水运工程》 北大核心 2007年第5期46-49,共4页 Port & Waterway Engineering
关键词 码头 大管桩 调查检测 修复方案 pier large concrete pipe pile check and inspection rehabilitation scheme
  • 相关文献

参考文献8

  • 1范卫国,李森林.北仑电厂一期、二期码头调查检测报告[R].南京:南京水利科学研究院,2006.
  • 2范卫国,王端宏,李森林.北仑电厂一期、二期码头大管桩裂缝修复加固方案设计[R].南京:南京水利科学研究院,2006.
  • 3CECS25:90.混凝土结构加固技术规范[S].[S].,..
  • 4CECS146:2003.碳纤维片材加固修复混凝土结构技术规程[S].[S].,..
  • 5JTJ291-98.高桩码头设计与施工规范[S].[S].,..
  • 6JTJ215-98.港口工程荷载规范[S].[S].,..
  • 7JTJ254-98.港口工程桩基规范[S].[S].,..
  • 8JTJ/T261-97,港口工程预应力混凝土大直径管桩设计与施工规程[S].

共引文献481

同被引文献64

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部