摘要
介绍了株洲航电枢纽船闸工程施工过程发生的变更与索赔情况,总结了工程合同变更与索赔的控制方法、办理程序、以及管理效果,探讨了低价中标项目合同变更与索赔管理的一些体会。
This paper introduces the change and claim happened during construction of Zhuzhou Navigation-Power Junction's Lock Project, summarizes the control method, procedure and management effect of engineering contract variation and claim, and presents some understandings to contract variation of low-price accepted bids and claim management.