期刊文献+

南水北调东线宝应泵站机电设备安装质量检测 被引量:10

Detection of installation quality of electromechanical equipments for Baoying pumping station in Eastern Route of South-to-North Water Transfer
下载PDF
导出
摘要 宝应泵站是南水北调东线第一个开工建设的项目,对以后其他泵站的建设起着示范的作用。简述了机电设备安装质量检测的重要性和必要性。针对宝应泵站,分析了机电安装质量检测的特点,指出了机电安装质量检测单位在检测前所需做的准备工作和检测过程中所需处理好的各种关系。较为详细地介绍了宝应泵站机电检测单位所做的具体工作;提出了改进泵站机电检测工作的设想,包括:检测单位必须具有相应的资质,检测工作范围应延伸至设备制造质量检测,改变检测工作的时间和方式等。 Baoying Pump Station was the first-built project in South-to-North Water Transfer Project. It provides an example for the construction of other pump stations. The significance and necessity of the detection of installation quality of electromechanical equipments are presented simply. The characteristics of the detection and installation quality of electromechanical equipments are analyzed. The preparation work before the detection in the detection for the detecting institution, is pointed out. The specific work of the detecting institution of Baoying Pump Station is explained. It provides advisable experience and direction to detect the installation quality of electromechanical equipment of the pump station for the future.
作者 汤正军
出处 《排灌机械》 2007年第3期27-30,共4页 Drainage and Irrigation Machinery
基金 国家自然科学基金资助项目(50179032) 江苏省水利科技重点资助项目
关键词 南水北调 宝应泵站 机电设备 安装 质量检测 South-to-North Water Transfer Projects Baoying Pump Station electromechanical equipment installation detection quality
  • 相关文献

参考文献5

二级参考文献8

共引文献16

同被引文献41

引证文献10

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部