摘要
我国公路建设项目前期工作中,风险管理是一个比较薄弱的环节,针对此情况,本文就公路工程风险管理的理论和实践问题做?了初步探讨,希望通过对公路项目的风险管理,为项目科学决策提供一些依据。
At earlier phase of highway building project in our country, the hazard administration is a weak link. Aiming at those circumstances the paper makes preliminary approach to theory and practice of hazard administration in highway engineering. We expect that the hazard administration in highway project would provide some basises for scientific decision for a project.
出处
《北方交通》
2007年第5期198-200,共3页
Northern Communications
关键词
公路工程
风险分析
科学决策
Highway engineering
Analysis of hazard
Scientific decision