摘要
介绍了国电电力建设研究所的双套管输送干灰技术在国电谏壁发电厂330MW机组第一电场长距离干输灰中的应用,重点介绍了系统设计、安装、调试和运行,以及系统性能测试情况。
The application of double casing pipes pneumatic ash transportation system in 330MW units of Jianbi Power Plant was introduced. The system design, installation, adjustment, operation condition and the system performance test were expounded in detail.
出处
《电力环境保护》
2007年第3期51-53,共3页
Electric Power Environmental Protection
关键词
双套管
输送干灰
性能测试
double casing pipes
ash transportation system
performance test