摘要
介绍了嘉兴发电厂二期工程设计中采用的节水优化措施。经过优化后的实际淡水取水量仅为0.11m3/s,低于《火力发电厂设计技术规程》要求的0.12m3/s指标,且系统运行正常。
The optimized water saving measurements on the phase Ⅱ project in Jiaxing Power Plant were introduced, The actual freshwater inflow amount was only 0.11 m^3/s after optimized design, it was low than the standard 0. 12 m^3/s and the system operation was steady.
出处
《电力环境保护》
2007年第3期61-62,共2页
Electric Power Environmental Protection
关键词
燃煤机组
优化设计
节水措施
coal- fired unit
optimized design
water saving measurement