摘要 变电站主接线的可靠性对电力系统有着重要的影响,为了便于在输电网供电可靠性分析计算中计及变电站电气主接线的影响,在综合应用电力系统可靠性理论、图论和面向对象的计算机技术的基础上,研究开发了用于定量评估计及变电站电气主接线影响的输电网可靠性的软件包系统。介绍了该系统的设计开发思路、软件包工作流程和功能以及有关的主要技术特点等。最后应用该软件包对我国华东地区某城市计及变电站电气主接线结构的输电网进行了供电可靠性定量评估,结果说明了该软件包的实际应用价值。 To consider the impact of bus arrangement in evaluation of the reliability of transmission network, a quantitative assessment software package of power supply reliability for transmission network including the bus arrangement is developed based on power system reliability theory, graph theory and Object Oriented Program (OOP) technology. The functions and related key features are introduced. The quantitative assessment of power supply reliability of transmission network in a city of East China is illustrated. The result proves that this developed software package is valid.
作者 陈云峰 张焰
出处 《现代电力》 2007年第3期44-47,共4页 Modern Electric Power
关键词 变电站 电气主接线 输电网 可靠性 软件包 substation bus arrangement transmission network reliability software package
  • 相关文献

参考文献6

二级参考文献46

共引文献163

同被引文献33

  • 1张鹏,郭永基.电气主接线可靠性评估的区间方法[J].电力系统自动化,2004,28(19):48-52. 被引量:30
  • 2谢开贵,董百强,赵霞,周家启.大型(变)电站电气主接线可靠性综合分析系统[J].电力系统自动化,2006,30(15):89-92. 被引量:15
  • 3董百强,谢开贵,周家启.电站3/2接线和4/3接线的可靠性比较分析[J].重庆大学学报(自然科学版),2006,29(10):10-15. 被引量:5
  • 4陈云峰,张焰.计及变电站主接线影响的输电网供电可靠性分析[J].继电器,2007,35(2):60-63. 被引量:13
  • 5LI W.Risk assessment of power systems:models,methods and applications[M].New Jersey,USA:John Wiley&Sons,2005.
  • 6ENDRENYI J.Three-state models in power systemreliability evaluations[J].IEEE Transactions onPower Apparatus and Systems,1971,90(4):1909-1916.
  • 7TSAO T F,CHANG H C.Composite reliabilityevaluation model for different types of distributionsystems[J].IEEE Transactions on Power Systems,2003,18(2):924-930.
  • 8SIDIROPOULOS M.Determination of substation modelsfor composite system reliability evaluation[C]∥Proceedings of the IEEE Power Engineering SocietyGeneral Meeting,June 24-28,2007,Tampa,FL,USA,Piscataway:IEEE Press,2007:1-7.
  • 9NIGHOT R,BILLINTON R.Reliability evaluation of theIEEE-RTS incorporating station related outages[C]∥Proceedings of the IEEE Power Engineering SocietyGeneral Meeting,June 06-10,2004,Denver,ColoradoUSA.[S.l.]:IEEE Press,2004,1:118-123.
  • 10LI W,LU J.Risk evaluation of combinativetransmission network and substation configurations andits application in substation planning[J].IEEETransactions on Power Systems,2005,20(2):1144-1150.

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部