摘要
福州浦上大桥主桥为364 m的三塔单索斜拉桥。详细阐述该桥斜拉索的挂设方法和施工工艺。
The main bridge of Pushang Bridge in Fuzhou is an single cable cable-stayed bridge with a main span 364 m and with triple pylons. In this paper, the construction methods and technology for installation of the stay cables of the Bridge are described in details.
出处
《桥梁建设》
EI
CSCD
北大核心
2007年第A01期50-54,共5页
Bridge Construction
关键词
斜拉桥
斜拉索
桥梁施工
施工技术
cable-stayed bridges stay cables bridge constructions construction technique