摘要
介绍了太原市北郊污水处理厂改扩建工程提升泵房沉井施工方案,包括沉井的制作、沉井的下沉、沉井下沉的观测、沉井的纠偏等。
This paper instructions the open caisson construction of the lift pump house of the reconstructed and expansion project in Taiyuan Beijiao Sewage Treatment Plant, which includes the manufacturing of the open caisson, the sinking of the open caisson, the observing of the open caisson sinking, and the error correcting of the open caisson, etc.
出处
《科技情报开发与经济》
2007年第16期246-247,共2页
Sci-Tech Information Development & Economy
关键词
提升泵房
沉井施工
污水处理厂
lift pump house
open caisson construction
sewage treatment plant