摘要
介绍了水文水资源工程建设程序,阐述了水文基本建设前期各项工作的具体要求,探讨了需要注意的问题。
This paper introduces the procedures of the hydrological and water resources engineering construction, and expounds the concrete requirements of each fore period work in the hydrological infrastructure, and probes into some problems needing attention.
出处
《科技情报开发与经济》
2007年第16期290-291,共2页
Sci-Tech Information Development & Economy
关键词
水文基本建设
前期计划管理
项目建议书
hydrological infrastructure
fore period planned management
project proposal