摘要
结合山西万家寨引黄北干线1号引水洞支北03-1支洞开挖进洞的成功实践,介绍了一套适合土洞斜井进洞的施工方法,为同类工程的施工提供了有益的经验。
The paper combined the successful practice that the north 1 guided the 03-1 branch steam into the hole in the Wan-jia villages of yellow River guidance project.A set of construction technology suitable for slop well of soil hole enterring hole was introduced ,which offered helpful experience for construction of the similar project.
出处
《太原科技》
2007年第6期82-84,共3页
Taiyuan Science and Technology
关键词
土洞
进洞
施工技术
引黄工程
Soil hole
Enterring hole
Construction technology
The yellow River guidance project