摘要 在电力系统中,发电机的并网操作是电厂的一项重要操作。在并网条件允许的条件下,自准周期并网装置在合闸导前时间到来时,发出并网指令,使电机组平稳的并入系统电网中,采用eCOG1k单片机完全可以满足并网装置控制的要求,并快速、可靠的获取所需要的参数信息。经过实验,这些方法是切实可行的。 Network-joining is one of the important manipulation procedures in power plants. In the condition of the incorporation installment allowed, when the advanced insertion time of closing resistor is coming, gives the command, lets the power grid merge into the power system smoothly. With the eCOG1 k singlechip it completely meets demand of the incorporation installment, gained the parameter information fastly and reliably. The experiment proved this method was practical feasible.
出处 《实验技术与管理》 CAS 2007年第6期37-39,共3页 Experimental Technology and Management
关键词 频率测量 相位角测量 单片机 计数器 并网装置 frequency measuring phase angle measuring signal-chip counter incorporation installment
  • 相关文献

参考文献7

二级参考文献17

  • 1李振然.利用富里叶变换实现微机自动准同期[J].继电器,1994,22(4):35-40. 被引量:14
  • 2高厚磊,江世芳,贺家李.利用卫星时间作基准的电力系统同步相量测量[J].电力系统及其自动化学报,1995,7(4):33-40. 被引量:17
  • 3索南加乐,葛耀中,王安定,田怀智,阿不力孜.一种不受电压过零点影响的新型频率测量方法[J].电力系统及其自动化学报,1996,8(4):18-22. 被引量:23
  • 4李瑞生.一种基于数字化采样计算电力系统频率的方法[J].继电器,1997,25(1):26-28. 被引量:12
  • 5A. G. Phadke. a new Measuremen Technique for Tracking Voltage Phasors ,Local System Frequency ,and Rate of Change of Frequency. IEEE on PAS, 1983 ,PAS-102(5): 1025-1033.
  • 6Prokin M. Dynamic response of the double buffered frequency measurement method. 9th IEEE Instrumentation and Measurement Technology Conference,Metropolitan, NY USA,1992(5) :46 -51.
  • 7Saehde M S,Shen J P. A new digital technique for measuring frequency at a power system bus. Fourth International Conference on Developments in Power Protection,Edinburgh UK,1989(4) :102 -106.
  • 8Wang A D, Ge Y Z, Lai L L, et al. A new digital algorithm for power system frequency measurements. 2nd International Conference on Advances in Power System Control.Operation and Management, Hong Kong , 1993 (12) :729 -733.
  • 9Kundu D, Technical Requirements to Connect Parallel Generators to the Ontario Hydro Distribution Electricity System[ J]. IEEE Transactions on Energy Conversion, 1992,7( 1 ) :8 - 14.
  • 10Moore P J,Carranza R D,Johns A T. Model system tests on a new numeric method of power system frequency measurement[J]. IEEE Transactions on Power Delivery, 1996,11 (2) :696 - 701.

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部