斜拉桥主梁采用前支点挂篮进行悬臂现浇施工时中间张拉索力的优化 被引量:3

Interim Cable Force Optimum of Cable-stayed Bridge with Concrete Girders during the Cantilever Cast-In-Place Construction Using Form Travelers with Fore-fulcra
下载PDF
导出
摘要 以石家庄市仓安路斜拉桥施工过程为例,通过分析斜拉桥和挂篮结构在施工过程中内力变化规律,确定合理的中间张拉次数与各次中间张拉索力。要求作为前支点的斜拉索在当前梁段施工过程中应根据主梁和挂篮受力的要求进行多次中间张拉,以便改善结构受力,保证施工安全。 This paper seeks to determine the reasonable frequency of tensioning and the interim cable forces according to the internal forces of the structure and traveler in the course of construction. The structure of the cable-stayed bridge and the travelers with fore-fulcra require that the cable must be tensioned several times during each construction course of girder to improve the structure mechanical state.
作者 杜水波
出处 《铁道建筑技术》 2007年第3期60-63,共4页 Railway Construction Technology
关键词 斜拉桥 前支点挂篮 中间索力的优化 cable-stayed bridge form travelers with fore-fulcra interim cable force optimum
  • 相关文献

参考文献2

二级参考文献2

  • 1黄强武.桥梁施工与组织管理[M].人民交通出版社,2000.
  • 2郭梅,吴向民.中国公路学会与结构工程学会1998年桥梁学术会议论文集.浅谈南昌新八一大桥挂篮设计与施工[A].北京:人民交通出版社,1998.

共引文献21

同被引文献29

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部