首钢5#高炉三座热风炉产生倾斜后,采用倾斜及沉降相结合的方法进行了一年监测,按期通报监测数据,使厂方及时掌握倾斜发展情况,确保高炉服役期间的安全。
After appearing inclination of hot blast stove of No. 5 blast furnace at Shoudu Iron & Steel Co., it takes a year to monitor using the combined method of inclination and settlement observation. The monitoring data are notified on time that enables the management to grasp the inclination development, and guarantees safety in production of hot blast stove.