摘要 扼要介绍了我国抽水蓄能技术和电站建设的发展概况及目标,论述了我国建设抽水蓄能电站的必要性及需要注意的问题。鉴于抽水蓄能技术的复杂性、我国在机组科研与设计制造方面的差距和需求量很大的现状,加快抽水蓄能机组设备国产化的进程已成为当务之急,从引进设备到打捆招标,在引进设备的同时引进技术,尽快实现国产化和本土化生产制造,通过竞争和择优比价来提升技术水平和产品质量。 The general situation and the target of the development of the pumped-storage hydropower stations and the related technologies are briefly introduced herein, in which the necessities and the remarkable problems of the construction is discussed as well. in light of the complexities of the technologies and the larger gap and the demands in the aspects of scientific research, design and manufacture of the units in China, it is necessary to accelerate the nationalization of the equipments for the units from only importing the equipments to importing the equipments along with the technologies at the same time by tendering, so as to realize the nationalization and localization of the manufacture of the equipments and to enhance the technical level and the quality of the equipments through the competition concerned as soon as possible.
作者 端润生
出处 《水利水电技术》 CSCD 北大核心 2007年第1期24-27,38,共5页 Water Resources and Hydropower Engineering
关键词 抽水蓄能电站 抽水蓄能机组 工程建设 国产化 pumped-storage hydropower station pumped-storage unit project construction nationalization
  • 相关文献

参考文献2

二级参考文献1

共引文献3

同被引文献28

引证文献4

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部