下桥水电站拱坝消能防冲设计与初期运行消能效果

Energy Dissipation & Erosion Protection Design and Preliminary Operating Effect of Arch Dam at Xiaqiao Hydropower Station
下载PDF
导出
摘要 龙江下桥水电站拦河拱坝处在背斜轴部,河床岩石破碎,抗冲能力低,厂坝之间相距近,用此前传统单坎式水垫塘,因消能效率低,不利坝基坝肩安全,也不能为电站尾水渠提供良好水力条件。作者重点叙述“三坎式水垫塘”产生的背景、依据与效果;介绍水垫塘结构设计要点与三年来泄洪消能工初期运行情况。 The arch dam of Xiaqiao Hydropower Station in Longjiang River is located in axial region of anticline where there are crashed rocks at the river bed. As the dam has a low erosion-resisting capacity and is adjacent to the plant, the traditional single-ridge plunge pool with a low energy dissipation efficiency can neither ensure the safety of dam foundation and abutment nor provide sound hydraulic conditions for the tailrace of the power sta- tion. The background, reference and effect of three-ridge plunge pool are presented in details together with the design gist of plunge pool structure and the preliminary operating status of flood discharging energy dissipation over the Past three vears.
出处 《红水河》 2007年第2期1-6,共6页 Hongshui River
关键词 拱坝 消能防冲 冲击式消力池 三坎式水垫塘 下桥水电站 arch dam energy dissipation & erosion protection impulse type stilling pool three-ridge plungepool Xiaqiao Hydropower Station
  • 相关文献

参考文献4

  • 1黄国强.隔河岩溢流坝下游消能塘底板设计.泄水工程与高速水流,1994,(2):21-25.
  • 2李锡精,等.广西下桥水电站工程设计工作报告[R].南宁:广西电力工业勘察设计研究院,河池:河池水利电力勘测设计研究院,2006.
  • 3莫正阳.广西龙江下桥水电站水工模型试验研究报告[R].南宁:广西水电科学研究院,2005.
  • 4莫正阳,罗秉珠,阙光英,闭多能,曾德坚.下桥水电站溢流表孔“三坎式水垫塘”消能工试验研究[J].红水河,2006,25(2):138-141. 被引量:2

二级参考文献2

  • 1SL282—2003.混凝土设计规范[S].,..
  • 2莫正阳,阚光英,闭多能.下桥水电站水工模型试验研究报告[R].南宁:广西水电科学研究院,2005.