针对景洪水电站水文气象条件、施工特点,以及上下游围堰和右冲坝段碾压混凝土温度控制标准,介绍景洪水电站纵向围堰高温季节碾压混凝土施工过程中采取的具体温控措施,以及业主在温控组织管理工作中采取的措施。对各项温控措施成效的统计分析表明,景洪水电站温控工作基本取得了预期成效,纵向围堰碾压混凝土至今未发现危害性的温度裂缝。
In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of RCC for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in RCC construction of longitudinal cofferdams at Jinghong Hydropower Station during the high temperature period. The statistical analysis shows that the temperature control measures have achieved expected result without any temperature-induced harmful cracks occurring in the longitudinal cofferdams.
出处
《水利水电科技进展》
CSCD
北大核心
2007年第3期46-48,63,共4页
Advances in Science and Technology of Water Resources
关键词
碾压混凝土
温度控制
防裂措施
组织管理
景洪水电站
RCC
temperature control
anti-cracking measure
management
Jinghong Hydropower Station