大规模混联水电系统长期发电优化调度模型及求解 被引量:10

Long-term optimal scheduling of large-scale hydropower systems for energy maximization
下载PDF
导出
摘要 采用改进判别式法求解大规模混联水电站库群发电优化调度问题.采用坐标轮换法,将多库同时供、蓄水决策转化为单库逐次轮换决策,可有效解决具有水力联系的多水库能量指数(K)求解困难.结合水库常规调度图规则,对水库时段蓄、放水量进行适当控制,以对原始判别式规则进行修正,使解算结果更为合理.结合长江中上游流域11座大型水电站调度系统,给出了一个大型混合水电站系统保证出力约束条件下发电量最大的实际例证. An improved discriminant criterion method (IDCM) derived form the discriminant criterion method is presented to solve long-term optimal scheduling operation problem of large-scale mixed hydropower systems. In order to avoid the difficulties arising from calculating the energy index K values of the reservoirs with hydraulics relations in the process, the coordinates rotation method is adopted to transfer the decision-making process for multi-reservoirs simultaneously to single reservoir alternate gradually. Combining of the routine operation chart rule of hydro plant, which is used to control the storing or dispatching water quantity of the time period in a reasonable bound, the IDCM proposed and the result derived from it is more reasonable. Taking the large-scale hydropower system consisting of eleven hydro plants in the middle-upper Yangtze River basin in China for example, the model of maximizing the energy with firm power of the hydropower system is tested.
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2007年第3期45-49,共5页 Engineering Journal of Wuhan University
基金 国家自然科学基金资助项目(编号:50409010) 科技部重大基础研究前期研究专项项目(编号:2004CCA02500)
关键词 混联水电系统 改进判别式法 水库调度图 坐标轮换法 优化调度 large-scale mixed hydropower system IDCM operation chart of reservoir coordinates rotation method hydropower long-term scheduling operation problem
  • 相关文献

参考文献8

  • 1Maceira M E P,Damtkio J M.The use of PAR(p) model in the stochastic dual dynamic programming optimization scheme used in the operation planning of the Brazilian Hydropower System[C]//8th International Conference on Probabilistic Methods Applied to Power Systems.Iowa State University,Ames,Iowa,September 12-16,2004:397-402.
  • 2方红远,王浩,程吉林.初始轨迹对逐步优化算法收敛性的影响[J].水利学报,2002,33(11):27-30. 被引量:22
  • 3Catalao J P S,Mariano S J P S,Mendes V M F.Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model[J].Electric Power Systems Research,2006,76(6-7):404-412.
  • 4Zambelli M,Siqueira T G,Cicogna M,et al.Deterministic versus stochastic models for long term hydrothermal scheduling[C]//Power Engineering Society General Meeting,2006.IEEE 18-22,2006:7.
  • 5Guan Xiaohong,Svoboda A,Li Chao-An.Scheduling hydro power systems with restricted operating zones and discharge ramping constraints[J].Power Systems,1999,14(1):126-131.
  • 6Zhou XiaoXi,Wang XianJia,Zhu ZhongYun.The model of optimizing the function of reservoir operation based on genetic programming[J].Machine Learning and Cybernetics,2002,3(4-5):1669-1672.
  • 7Estropez N,Nagasaka K.A month ahead micro-hydro power generation scheduling using artificial neural network[C]//Power Engineering Society General Meeting,2005.IEEE 12-16,2005,1:28-34.
  • 8张勇传.水电站水库调度[M].北京:中国工业出版社,1963.

二级参考文献4

  • 1刘肇祎 郭元裕.排灌工程系统分析[M].北京:水利电力出版社,1988.97-112.
  • 2Howson H R, Sancho N G F. A new algorithm for the solution of multi-state dynamic programming problems[J],Math.Programm.1975,8(1):104-116.
  • 3Turgeon A. Optimal short-term hydro scheduling from the principle of progressive optimlity[J].Water Resour.Res.,1981,17(3):481-486.
  • 4Yeh W.W-G.Reservoir Management and Operation Models:A State-of-the-Art Review[J].Water Resour.Res.,1985,21(12):1797-1818.

共引文献21

同被引文献75

引证文献10

二级引证文献86

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部