摘要
湖南电网现有自动发电系统(AGC)是参照A标准建设的,鉴于华中电网采用了基于CPS标准的联络线控制标准,通过进行A标准AGC适应CPS标准的试验研究,得出了现有AGC不适应CPS标准的结论,指出了进行CPS改造的必要性和技术要点,并针对过渡时期可以采取的临时措施进行了讨论。
The existing AGC in Hunan power grid was built according to A type standard. Considering tie-line control standard based on CPS in Centre China power grid, whether AGC based on A type standard was adapt to CPS was tested. The result indicated that the existing AGC did not suit CPS. The necessity of technical outline of CPS modification was presented and temporary measures taken during interim were discussed.
出处
《湖南电力》
2007年第3期4-7,共4页
Hunan Electric Power