7S. Patel, B. G. Dale, P. Shaw. Set - up time reduction and mistake proofing methods:an examination in precision component manufacturing[ J ]. The TQM Magazine ,2011, 13(3) :175 - 179.
9Meister O. Human Reliability Analysis:Data Issues and Errors of Commission [ J ]. Reliability Engineering & System Safety,2012, 83(2) :127 ~274.
10Swain Y, Hollnagel E. Failures without err ors:quantification of context in HRA [ J ]. Reliability Engineering & System Safety,2012, 83(2) :145 -151.