不对称变截面箱梁桥在悬臂施工阶段扭转控制分析 被引量:2

Torsion-control Analysis of Box-girder Bridge of Anisomerous Variable Section at the Stage of the Balanced Cantilever Construction
下载PDF
导出
摘要 采用空间理论方法、剪力流理论及Prandtl的薄膜比拟法,推导出了不对称箱型变截面梁悬臂施工扭转角度和剪力计算公式.并用该公式对重庆鱼洞长江大桥在悬臂施工阶段箱梁扭转变形及受力进行了计算分析.计算结果证实了,在施工阶段因恒载和施工荷载的不对称分布产生的扭矩对主箱梁的扭转变形影响不大,箱梁所受到的内力在施工控制许容范围内. Based on the dimensional theory method, the theory of shearing force flows and Prandtl' s soapfilm analogy method,formulas for calculating torsional angle and shearing force of box beam 6f anisomerous variable section at the stage of the balanced cantilever construction were inferred. By means of the formulas, the torsion, distortion and internal force of the box beam of C'hongqing Yudong Changjiang Bridge at the stage of balanced cantilever were calculated and analysed. The calculationval result validates that the torque which is produced because the dead load and the constructing load distribute anisomerously has few torsion and distortion on the box beam,and that internal force on the box beam is in the controllable area.
出处 《重庆交通学院学报》 2007年第3期24-28,40,共6页 Journal of Chongqing Jiaotong University
关键词 连续刚构桥 悬臂施工 不对称变截面 箱粱扭转变形 continual rigid frame bridge the balanced cantilever construction anisomerous variable section torsion and dis-tortion of box beam
  • 相关文献

参考文献6

  • 1范立础.桥梁工程[M].北京:人民交通出版社,2001..
  • 2向海帆.高等桥梁结构理论[M].北京:人民交通出版社,2001.
  • 3李庆华.材料力学[M].成都:西南交通大学出版社,2002.
  • 4[捷]克里斯特克著,何福照,吴德心译.箱梁理论[M].北京:人民交通出版社,1988.
  • 5[美]C.P.汉斯.结构杆件的弯曲与扭转[M].常岭,吴绍本译.北京:人民交通出版社,1981.
  • 6方萍,张天明,钟琼,黄东,薛飞宇.重庆鱼洞长江大桥主桥上部结构设计和计算[J].公路交通技术,2005,21(B07):34-38. 被引量:2

共引文献503

同被引文献3

  • 1JTGD62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].[S].,..
  • 2CJJ 37-2012,城市道路工程设计规范[S].2012.
  • 3CJJ11-2011,城市桥梁设计规范[S].2011.

引证文献2