浅谈喜河水电站加快施工进度的措施

Discuss on Measures for Speeding up Construction of Xihe Hydropower Station
下载PDF
导出
摘要 喜河水电站施工时段短,强度高,工期控制突出,以及汉江洪水峰高量大、陡的特点,优化施工方案,采取分期导流,施工新技术、新措施,加快施工进度了使电站于2006年6月30日第一台机组提前半年并网发电。 The construction time of Xihe hydropower station was short with high intensity, and the flood of the Hanjiang River had the features of large peak flow with sharp hydrographs, so that the construction schedule might be controlled strictly. The optimal construction scheme was adopted, consisting of flow diversion by stages, use of new construction technology and new measures, by which the construction was speeded up and made the first set of generator put into operation ahead of schedule half a year.
作者 赵五一 ZHAO Wu - yi (China Hydropower Construction Consulting Company, Beijing Division, Beijing 100024, China)
出处 《西北水力发电》 2007年第3期66-67,77,共3页 Journal of Northwest Hydroelectric Power
关键词 施工方案 分期导流 施工进度 喜河水电站 construction scheme flow diversion by stages construction schedule
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部