摘要
提出了一个基于准时交货的Job-Shop多机调度模型.应用模拟退火方法并结合启发式算法,给出了求解该模型的一种新方法.通过仿真算例说明了方法的有效性.
The general scheduling model of multi machine for minimizing the earliness and tardiness penalties is proposed. A new approach to solve the problem by combining the heuristic algorithm with simulated annealing approach is presented. Simulated computational results show that this approach is effective.
出处
《东南大学学报(自然科学版)》
EI
CAS
CSCD
1997年第3期94-97,共4页
Journal of Southeast University:Natural Science Edition