期刊文献+

基于判别分析的工程项目合作绩效影响要素研究 被引量:2

Factors influencing the performance of engineering project collaboration based on discriminant analysis
下载PDF
导出
摘要 建立在国内外相关研究结论以及专家访谈基础上的合作管理定性指标筛选问卷,对62个工程项目的186名项目参与者进行了调查,使用因子分析和判别分析找到业主、承包方以及监理获得成功合作的显著因素.通过对不同合作方获得合作绩效的影响因素的研究,并结合我国工程项目合作实践现状的进一步分析,工程项目合作方的需求得以清晰. Based on related researches and experts' interviews, a questionnaire is made to filtrate sensible factors to collaboration performance. 62 engineering projects located in Changsha and Qingdao are investigated and 186 interviewees who are the principals of the engineering projects were interviewed. Factor analysis and discriminant analysis are employed to find the factors influencing the success collaboration of the different partners. The result is analyzed with the collaboration practice. The demands of the partners have been legible.
作者 何晓晴
机构地区 广州大学
出处 《广州大学学报(自然科学版)》 CAS 2007年第4期91-94,共4页 Journal of Guangzhou University:Natural Science Edition
关键词 判别分析 合作绩效 工程项目 discriminant analysis performance of collaboration engineering project
  • 相关文献

参考文献4

  • 1Jones M,Saad M.Manage innovation in construction[M].London:Thomas Telford,2003:197-199.
  • 2Gransberg D D,Dillon W,Reynolds Lee,et al.Quatitative analysis of partnered project performance[J].Journal of Engineering and Management,1999,125(3):161-166.
  • 3CHAN A P C,CHAN D W M,CHANG Y H,et al.Exploring critical success factors for partnering in construction projects[J].Journal of Construction Engineering and Management,2004,130(2):188-198.
  • 4何晓晴,曾志坚.工程项目合作管理定性指标体系的构建与分析[J].财经理论与实践,2006,27(3):110-113. 被引量:4

二级参考文献18

  • 1何晓晴,谢赤.工程项目合作的定性模拟研究[J].改革与战略,2006,22(4):33-36. 被引量:5
  • 2邓建华.Kappa 值在 Nottingham 健康量表信度测量中的应用[J].中国卫生统计,1997,14(1):17-19. 被引量:12
  • 3Clegg,S.R.Contracts cause conflicts[C].In P.Fenn and R.Gameso,eds.Construction conflict management and resolution,1992,128~144.
  • 4Ahmed,S.M.,Ahmad,R.,and de Saram,D.D.Risk management trends in Hong Kong construction industry:A comparison of contractors and owners perceptions[J].Engneering,Construction,Architecture Management,1999,6(3):256~266.
  • 5Mitropoulos,P.,and Taum,C.B.Management-driven integration[J].Journal of Management Engineering.2000,16(1):48~58.
  • 6Latham,M.Constructing the team:Joint review of procurement and contractual arrangements in the UK construction industry[D].Dept.of the Environment,London,1994.
  • 7Krippaehne,R.C.,McCullouch,B.G.,and Vanegas,J.A.Vertical business integration strategies for construction[J].Journal of Management in Engineering,1992,8(2):153~166.
  • 8Lei,D.Offensive and defensive uses of alliances[J].Long Range Planning,1993,26(4):32~41.
  • 9Shash,A.A.Subcontractors' bidding decisions[J].Journal of Construction Engineering and Management,1998,124(2):101~106.
  • 10Kubal,M.T.,Miller,K.,Worth,R.D.Building profits in the construction industry[M].New York:McGraw-Hill,2000.

共引文献3

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部