摘要
拟建黄田水电站位于广东省河源市东江干流河段上,消能防冲问题是保证工程稳定运行的前提。通过整体物理模型消能防冲试验,改进了设计消能方案,并提出在通航期间闸门开启的优化调度方案,供工程设计时参考。
The proposed Huangtian Hydropower Plant will be located on the Dongjiang river section in Heyuan city. Energy dissipation and erosion-control is very important for the steady operation of project. Through integral physical model experiment research, the original energy dissipation and erosion-control design proposal is improved, and a optimized dispatching plan for gate opening during navigation period is proposed which may be references for engineering design.
出处
《广西水利水电》
2007年第3期24-26,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
试验
水电站
消能防冲
Experiment
Hydropower Plant
energy dissipation and erosion-control