自动发电控制在黄河上游梯级电站间的应用

Application of Automatic Generation Control in Upper Stream of Yellow River Step Power Stations
下载PDF
导出
摘要 随着黄河上游电站的滚动开发,先后建成了龙羊峡、李家峡、公伯峡等大型梯级电站,现在龙羊峡、李家峡、公伯峡、苏只四座电站的监控系统已接入黄河公司集中控制中心,这为集控中心开发梯级电站的自动化系统的高级软件应用提供坚实的基础,文章主要探讨如何在梯级电站间实现自动发电控制。 Along with the successive development of upper stream of Yellow River power stations, some large - scale step hydropower stations has been established such as Longyangxia, Lijiaxia and Gongboxia power station. At present, the monitoring system of Longyngxia, Gongboxia, Lijiaxia and Suzhi power station has been connected into the centralized monitoring center of Yellow River Upper Stream Development Co. ,Ltd, and this provides tough basis for the centralized monitoring center to developing advanced software of step power station automatic system. The paper mainly discusses how to realize automatic generation control between step power stations.
作者 赵涛
出处 《青海电力》 2007年第2期50-52,共3页 Qinghai Electric Power
关键词 集中控制 梯级电站 自动发电控制 centralized control steo power station automatic generation control
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部