摘要
结合上海地铁盾构施工,从设备选型、使用、维护与施工方面介绍了盾构法施工的关键环节。
Combining with TBM Construction of ShanghaiSubway, this article illuminates the key aspects of TBM Construction including equipment selecting, making use, constructing and maintaining.
出处
《工程建设与设计》
2007年第6期117-122,共6页
Construction & Design for Engineering
关键词
盾构施工设备选型
使用
施工
维护管理
tbm(tunnel boring machine) construction equipment selecting
making use
constructing
maintaining and managing