摘要
结合工程实际,介绍在公路桥梁工程中,高墩身液压滑升模板施工的工艺原理和施工过程,结果表明,该施工工艺的运用简化了施工工序,缩短了工期,节约了施工成本。
Combined with engineering practice,this paper introduces the technical princle and construction process of hydralic slip-form construction process of high-rise pier.The results show that the construction process is simplified, the construction period and cost is reduced by hydralic slip-form construction.
出处
《现代交通技术》
2007年第3期53-55,共3页
Modern Transportation Technology
关键词
桥梁工程
高墩身
液压滑升模板
施工工艺
bridge engineering
high-rise pier
hydraulic slip-form
construction technology