摘要 通过引入GBOM的属性-属性值-配置规则模型解决大规模定制下物料表达问题;改进基于属性-属性值相似的物料时段生产计划制定方法,以确定各最终零部件的加工数量和加工时间;根据延迟区分生产模型,提出基于知识的物料阶段生产计划,以快速地确定各个加工阶段的物料需求。开发了相应的生产计划模块,并以活扳手的活嘴生产为例,验证了上述广义通用件生产计划方法在实际生产中的有效性与方便性。 The attribute-value representation in Generic BOM (GBOM) together with the corresponding configuration rules is applied to deal with components'varieties. To determine the production quantities and process period of common components, time-interval-production plans are then established based on GBOM. According to a postpone- ment oriented production model, production quantities and process period of common components, time-interval-pro- duction plans are then established based on GBOM. According to a postponement oriented production model, production plans for stages are made to quickly determine the batch quanty of each processing stage with aid of the prescribed knowledge rules. Finally, a case study illustrates the feasibility and efficiency of the proposed production planning method of generalized common component.
出处 《机械设计与研究》 CSCD 北大核心 2007年第3期96-99,I0001,共5页 Machine Design And Research
关键词 大规模定制 广义通用件 生产计划 通用BOM 延迟区分 mass customization generalized common component production planning generic bill of material postponement
  • 相关文献

参考文献7

  • 1B约瑟夫 澴恩.大规模定制一企业竞争新前沿[M].北京:中国人民大学出版社.2000,41-49.
  • 2PLENERT G.Foeuing truial reaquremnte planning(MRP)to-wards performanee[J].Europoan Journal of Operarfonal Researech,1999,119(1):91-99.
  • 3HO J C,CHANG YJ.An integrated MRP and JTT francwork[J].Computers & Omdistrop; Emgoncering ,2001,41(2):173-185.
  • 4OLSENK A,SAETREP,THORSTENSON A.A procedureoriented gencric bⅢ of materials[J].Computers & Industerial Engineering ,1997,32(1):29-45.
  • 5FEITZINGER E,LEE HL,Mass customization at Hewlett-Packard:The power of postponemcat[J].Haward Busicess Review,1997,75(1):116-121.
  • 6RUDBERG M,WIKNER J.Mass customization in coma of the cestomer order deocupling point[J].Production Plaruding & coptrol.2004,15(4):445-458.
  • 7DURAY R,WARD PT,MILLICAN G W ,et al ,Appreschea to mass customization:conflgurations and cmpurical validation[J].Journal of Operations Manapenment,2000,18(6):605-625.

同被引文献13

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部