期刊文献+

基于AHP的模糊综合评价在铁路建设生态环境影响评价中的应用 被引量:1

Application on Fuzzy Comprehensive Evaluation Based on AHP in the Ecology Environmental Impact Assessment of Railway Construction
下载PDF
导出
摘要 总结了铁路建设项目生态环境影响评价的现状,指出其不合理之处,提出新的方法进行评价。即利用改进的层次分析法(AHP)确定权重,减少了人为确定权重可能带来的误差,用构造的模糊模式识别模型及模糊综合评判对铁路生态项目进行评价,使生态环境影响评价项目的适宜性更加科学、合理,同时这种AHP和模糊数学相结合的方法也适于解决其他类似问题。 In this paper a new method is given to valuation after generalized the current situation of ecology environmental impact assessment of railway construction and pointed out its unreasonableness. Proved AHP is used to ascertain weight, decreasing man-made error, using constructed fuzzy mode distinguish from model to appraise the construction project, andmaking the suitableness of the ecology environmental impact assessment project more science and advisability, at the same time the combination of AHP and fuzzy mathematics is also used to solve the other similar problems.
出处 《铁道劳动安全卫生与环保》 2007年第3期116-119,156,共5页 Railway Occupational Safety Health & Environmental Protection
关键词 AHP 模糊综盒评价 生态环境影响评价 铁路建设 AHP fuzzy comprehensive evaluation ecology environmental impact assessment railway construction
  • 相关文献

参考文献3

二级参考文献9

共引文献13

同被引文献11

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部