期刊文献+

技术站列车编组计划要素t_节计算方法的商榷 被引量:3

Research on Formula of Profits Gotten by Transferring Wagons at Marshalling Yard Without Shunting Operations
下载PDF
导出
摘要 货车无改编通过技术站的车小时节省t节是计算技术站列车编组计划的要素,其准确性直接影响到计算结果.现行计算方法使t节的取值偏小,实践上也无法操作.本文认为在计算中不应减去t集,通过分析货车在技术站进行无调、有调中转作业的车辆停留时间,并考虑到车辆改编作业成本,修正了t节的计算公式. The profits gotten by transferring wagons at marshalling yard without shunting operations is an important factor for making freight train formation plan of marshalling yards, whose veracity directly affects the results of the calculation. The existing formula to calculate it makes the value of the profits smaller than the right one and lacks the maneuverability to figure it out. In this paper,it comes to a conclusion that the accumulating time per wagon at the technical station en route should not be taken into account when calculate the profits. According to analyzing the staying time and total costs of wagons at the station for transfer operation with or without shunting operations, the formula calculating the profits of wagon by passing through marshalling yards is revised in order to offer the theory and the method to get the values when making the freight train formation plan.
作者 钱名军
出处 《兰州交通大学学报》 CAS 2007年第3期48-50,共3页 Journal of Lanzhou Jiaotong University
关键词 铁路运输 列车编组计划 有调中转 无调中转 货车无改编通过技术站的节省 railway transportation freight train formation plan transfer operation of wagon with shunting operation transfer operation of wagon without shunting operation profits gotten by transferring wagons at marshalling yard without shunting operations
  • 相关文献

同被引文献6

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部