资金流约束下的动态联盟项目计划优化算法

An Optimization Algorithm for Project Plan of Agile Virtual Enterprise with Capital Flow Constraint
下载PDF
导出
摘要 资金能力是影响项目计划执行的重要因素之一.针对这一情况,提出以满足资金流约束为目标的动态联盟项目计划优化算法.该算法在满足项目交货期和任务优先约束关系的前提下,使项目计划的支出资金流满足盟主企业的可用资金流的约束,从而增强项目计划的可执行性. Capital competence is one of the most important factors to implement project plan. To solve the problem, the optimization algorithm for project plan of agile virtual enterprise is proposed, whose objective is to satisfy capital flow constraint. The algorithm considers two important characteristics of project plan including project completion time and precedence relation between activities, and makes the capital expenditure flow satisfy the available capital flow in order to improve performability of project plan.
出处 《哈尔滨理工大学学报》 CAS 2007年第1期21-24,共4页 Journal of Harbin University of Science and Technology
基金 哈尔滨市后备带头人(2004AF×J039)
关键词 项目计划 动态联盟 资金流 优化算法 project plan agile virtual enterprise capital flow optimization algorithm
  • 相关文献

参考文献6

二级参考文献17

  • 1朱弘毅.网络计划技术[M].上海:复旦大学出版社,1998..
  • 2白思俊.多资源约束的网络计划的启发式优化方法[J].系统工程理论与实践,1995,15(7):42-47.
  • 3[1]EVARISTO R, FENEMA P C V.A typology of project management emergence and evolution of new forms [J].International Journal of Project Management,1999, (17):275-281.
  • 4[2]SAUER J, SUELMANN G, APELRATH H J. Multi-site scheduling with fuzzy concepts [J].International Journal of Approximate Reasoning,1998, (19) :145-160.
  • 5NUDTASOMBOON N, RANDHAWA S U. Resource-constrained project scheduling with renewable and non- renewable resources and time-resource tradeoffs[J]. Computers Industrial Engineering, 1997, 32(1): 227-242.
  • 6DE REYCK B, HERROELEN W. A branch-and- bound procedure for the resource - constrained project scheduling problem with generalized precedence relations [J]. European Journal of Operational Research, 2000, 111 (1): 152 - 174.
  • 7BRUCKER P, DREXL A, et al. Resource-constrained project scheduling: notation, classification, models, and methods[J]. European Journal of Operational Research, 1999, 112(1): 3-41.
  • 8PHILIPPE B, CLAUDE LE P. Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems[J]. Constraints, 2000, 5(1/2),119-139.
  • 9ODDI A, SMITH S F. A constraint-based method for project scheduling with time windows[J]. Journal of Heuristics,2002, 8(1):109-136.
  • 10FRANCK B, NEUMANN K, SCHWINDT C. Truncated branch-and-bound, schedule-construction, and schedule - improvement procedures for resource- constrained project scheduling[J]. OR-Spektrum, 2001, 23(3): 297-324.

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部