摘要
结合太原市北郊污水处理厂工程,探讨了污水提升泵房沉井结构设计和施工的一般步骤,同时提出了设计施工注意事项,对地下建筑物的结构设计和施工具有一定的参考意义。
Cornbined with upgrading and expansion engineering of sewage treatment plant in northern suburbs the structural design and construction of extra caisson of pumping station is introduced . The points deserving sttention in design and construction are also presented, which provides good references for structural design and construction of substructures.
出处
《山西建筑》
2007年第20期140-141,共2页
Shanxi Architecture
关键词
沉井结构
设计和施工
内力分析
抗浮验算
extra caisson, design and construction, internal force analysis, anti-floating computation