文章就湖北黄石西塞山电厂工程调试中曾经出现的问题,对上海新华控制工程公司XDPS系统的品质传递、扫描时序、页面执行周期等问题进行了分析研究,提出了处理方法。
When commissioning in Huangshi Xisaishan power plant,there existed some problems at Xinhua Company XDPS system, such as:quality transfer, scan sequence, page executing period and so on, the treatment procedure was proposed.
出处
《湖北电力》
2007年第3期48-50,共3页
Hubei Electric Power