摘要 介绍了白马循环流化床示范电站有限公司循环流化床(CFB)锅炉的双支腿结构特点及锅炉在调试过程中出现的床料翻床现象,分析了床料翻床的原因,并提出了行之有效的解决办法,其运行经验值得国内同型机组借鉴。 The features of dual support- leg structure for circulating fluidized bed (CFB) boiler in Baima CFB Exemplary Power Plant Co Ltd, as well as the turning - over phenomenon of bed - material in debugging process of said boiler have been presented. The caues leading to turning- over of bed- material being analysed, and effective solving measures being put forward. The experience in operation of said boiler is worth to be used for reference to other similar units in our country.
出处 《热力发电》 CAS 北大核心 2007年第6期127-129,共3页 Thermal Power Generation
关键词 循环流化床锅炉 双支腿 床料 翻床 运行调整 CFB boiler dual support - leg bed - material "turning - over" combustion adjustment
  • 相关文献

参考文献3

  • 1Sichuan Baima 300 MW CFB boiler general operation instruction France[Z].Alstom Power Boiler,2005,(03).
  • 2Sichuan Baima 300 MW CFB boiler description France[Z].Alstom Power Boiler,2005,(01).
  • 3Sichuan Baima 300 MW CFB boiler island general arrangement-furnace lower part France[Z].Alstom Power Boiler,2005,(05).

同被引文献56

引证文献11

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部