摘要
施工图预算的审核是合理确定工程造价的必要程序及重要组成部分。但由于施工图预算的审核对象不同,或要求的进度不同,或投资规模不同,则审核方法不一样。在建筑安装工程中,土建工程占投资比例较高,因而,审核的重点往往在土建工程施工图预算。
Budget of construction drawing project is important for the engineering cost. Different objects, schedules and investment scale have different auditing methods. Construction investment proportion is higher in all the architecture installation engineering and the auditing emphases is the budget of construction drawing project.
出处
《林业科技情报》
2007年第2期108-108,111,共2页
Forestry Science and Technology Information