摘要
以上海市污水治理三期工程UWW1.4A标工程为实例,分别从项目的功能性、可行性、经济性和时间性的角度对优化方案进行合理性分析和评价。采用变更顶管井工艺和延长顶管距离的方法解决了工程实际困难,降低了总造价,确保了工程顺利实施。
Taking a case of the bid UWW1.4A of Shanghai sewage treatment project III,from the four angles of functionality,feasibility,economical efficiency and timeliness,the author made a rational analysis and evaluation on the optimized plan.Through changing the pipe-jacking well technique and extending the distance of the pipe,the practical troubles were resolved.These measures decreased the general cost and guaranteed its success.
出处
《中国市政工程》
2007年第3期60-61,共2页
China Municipal Engineering
关键词
市政工程
功能性
可行性
经济性
时间性
方案比较
综合评价
municipal engineering
functionality
feasibility
economical efficiency
timeliness
plans comparison
comprehensive value