泗泾站装设500kV高压串联电抗器的过电压分析 被引量:9

Over-voltage analysis after installation of 500 kV series reactors in Sijing Substation
原文传递
导出
摘要 在500 kV系统中装设串联电抗器可以在不改变电网结构、不影响潮流分布和电网稳定性的条件下有效地限制系统短路电流水平,从而确保断路器的正常运行。论述了上海500 kV电网安装高压串联电抗器的必要性,结合500 kV泗泾—黄渡线路串抗工程,对相关的过电压课题进行了分析,并提出了相应的建议。 To install series reactors in 500 kV systems can effectively limit the short-current level of the system without having to change the grid structure and affecting the flow distribution and grid stability, thus can ensure normal operation of circuit breakers. The necessity of installing high voltage series reactors in Shanghai 500 kV grids is illuminated, and consequent over-vohage problem is analyzed for the series reactor project for 500 kV Sijing-to-Huangdu line. Relevant suggestions are proposed.
作者 薛敏
出处 《华东电力》 北大核心 2007年第6期44-46,共3页 East China Electric Power
关键词 串联电抗器 短路电流 过电压 断路器 series reactor short-circuit current over-voltage circuit breaker
  • 相关文献

同被引文献46

引证文献9

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部