1Liyin Shen,Bowson K.H.Lee,and Zhihui Zhang. Application of BOT System for Infrastructure Projects in China [J]. Journal of Construction Engineering and Management, December 1996: 319-323.
2K. A. K. Devapriya. F. Pretorius. The Economic Implication of Project Finance Arrangements for Boo/Bot Power Projects in Asia[J]. Journal of Construction Research, Vol. 3, No. 2 (2002): 285-309.
5S.YE& R.K.L.TIONG. Government Support and Risk-return Trade-off in China's BOT Power Projects[J]. Engineering, Construction and Architectural Management 2000.7 (4):412-422.
6Shen L. Y., Li H. and Li Q.M, Alternative Concession Model for Build Operate Transfer Contract Projects[J]. Journal of Construction Engineering and Management,2002,Vol. 128 No. 4, 326-330.
7Shen, L. Y., and Wu Y. Z. Risk Concession Model for Build Operate Transfer Contract Projects[J]. Journal of Construction Engineering and Management, Vol. 131, No. 2:211-220.
8Robert L.K.Tiong. BOT Projects: Risks and Secufities[J].Construction Management and Economics,8(1990) : 315-328.
9M.M. Kumaraswamy, X.Q. Zhang. Governmental role in BOT-led infrastructure development [J]. International Journal of Project Management, 19(2001): 195-205.
2Shen Liyin,J Construction Engineering Management ASCE,1996年,122卷,4期,319页
3Li Qiming,J Construction,MOC,1994年,7页
4L.Y.shen,H.Li,Q.M.Li.Alternative concession model for build operate transfer contract projects[J].Journal of construction Engineering and management,2002,128(4):326~330.
5Beijing Engineering Consultant Corporation(BECC).Guideline on the application of BOT project[M].Beijing:Earthquake publication,1995.15~64.
10Brinkerhoff D W, Brinkerhoff J M. Public-private partnerships: Perspectives on purposes publicness and good governance[J] . Public Administration and Development, 2011, 31 (1SI): 2-14.