摘要
针对唐山水泥机械厂为海螺集团张家港粉磨站设计制造的φ3×9 m磨机在使用过程中出现双层隔板仓倒塌现象的原因分析,提出了φ3×9 m磨机双层隔板改造的方案,从而从根本上解决了磨机双层隔板仓倒塌现象的发生。
Aim at Tangshan the landscape mire machine factory whets the station design manufacturing for the trumpet shell group Zhangjiagang powder of φ3 × 9 m whet the reason analysis that the machine appears a pair of layerses to separate the plank camalig to tumble down the phenomenon in use process, put forward the φ3 × 9 m whet the project that a layer of machine separates the plank reformation, solved to whet the occurrence that a layer of machine separates the plank camalig to tumble down the phenomenon thus and by the root.
出处
《煤矿机械》
北大核心
2007年第7期141-142,共2页
Coal Mine Machinery
关键词
磨机
双层隔板仓
倒塌
mill
double clapboard
collapse