期刊文献+

沈阳地铁某站后折返线基坑钢支撑轴力监测与分析 被引量:2

Monitoring and Analysis of Axial forces of Steel Supports of a Foundation Pit of Shenyang Metro Works
下载PDF
导出
摘要 沈阳地铁某站站后折返线基坑底板埋深约8.6m,采用排桩加钢支撑支护,明挖法施工,排桩采用800@1200钻孔桩,钢支撑采用609钢管,桩顶用冠梁将排桩连接为整体。介绍了开挖阶段钢支撑的架设及轴力的监测和分析结果。 The bottom floor of a foundation pit of Shengyang Metro works is 8.6 m deep. The foundation pit is constructed by open-cut method and reinforced by piles in row and steel supports. The piles in row consist of bored piles with 800 mm diameter and 1200 mm spacing and the steel supports consist of steel pipes with 609 mm diameter. Top beams are installed on the top of the bored piles to connect them into an integral structure. In the paper, the installation of the steel supports is described and the monitoring and analysis of the axial forces of the steel supports are presented.
作者 王学军
出处 《隧道建设》 2007年第3期28-30,共3页 Tunnel Construction
关键词 地铁 基坑 钢支撑 监测与分析 Metro foundation pit steel support monitoring and analysis
  • 相关文献

参考文献6

二级参考文献15

  • 1曾国熙 潘秋元.软粘土地基基坑开挖性状的研究[J].岩土工程学报,1988,10(3).
  • 2刘建航.上海地铁1号线地下工程技术总结[M].上海市地铁总公司,1995..
  • 3孙岳崧 濮家骝 等.不同应力路径对砂土应力应变关系的影响[J].岩土工程学报,1987,9(6):79-87.
  • 4王元湘,地下工程与隧道,1994年,3期
  • 5王元湘,隧道及地下工程,1994年,4期
  • 6王勖成 邵敏.有限单元法基本原理和数值方法[M].清华大学出版社,2001..
  • 7Nagaraj T S,Murthy M K,Sridharan A. Incremental loading device for stress path and strength testing of soils[J]. Geotechnical Testing Journal,1981,4(2):345~347
  • 8Yudhbir Varadarajan A,Mathur S K. Evaluation of stress-strain modulus of saturated clays[A]. In:Proceedings of 4th Southeast Asian Conference on Soil Engineering[C]. [s. l.]:[s. n.],1975,136~140
  • 9Sture S,Desai C S,Janardhanam R. Development of a constitutive law for an atificial soil[J]. Numerical Methods in Geotechnics,1979,1:76~79
  • 10陈鸿.支撑预加轴力情况下墙体先期位移的修正[J].地下工程与隧道,1997(4):33-37. 被引量:7

共引文献138

同被引文献21

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部